SAVANNAH TECHNICAL COLLEGE - PHASE III RENOVATIONS
Savannah, Georgia

Size: 30,983 square feet
Construction cost: $3.5 million

This project is the third of three renovation phases designed by Lott + Barber as a result of the master plan developed in 1996. This third phase includes a new main entrance facade, a 32-foot tall by 162-foot long radius wall, using a new concrete mix design process called "self-compacting concrete". The building expansion portion of the project is a 4,622-square foot addition which creates a more dramatic entry lobby, an added board room and circulation space.

Renovations include complete interior demolition of the existing administration and circulation with all new systems throughout; complete renovation of the existing campus shop and expansion into vacated adjacent suite; complete renovation of the existing cosmetology suite incorporating a dedicated classroom; and renovation of the existing 7,000-square foot auditorium, removing the sloped stadium type floor and fixed seating and handicap ramp, allowing more flexibility for this space. Work also includes a new fixed stage and exterior vestibule addition.

110 EAST PRESIDENT STREET, SUITE 300 (31401) | POST OFFICE BOX 22097 (31403) SAVANNAH, GEORGIA 31401 | PHONE: 912.234.5230 | FAX: 866.678.5688